Testing and FAT

According to our level of quality requirement, all our systems go through a double control - unit and system- before delivery. This upstream approach shortens the SAT time and guarantees the proper functioning of the products. 

A faster and more reliable site acceptance test

After a complete unit control in the workshop, the cabinets are connected between them according to the final configuration of the transformer station. The functioning of the substation is simulated during the acceptance tests by the System integration team. We can test complete systems thanks to 12 rooms entirely equipped with supply and process simulator.
 

The client gets familiar with the product easily: the adjustemens and parameters are configured and tested safely.

In Toulouse, each cabinet is manufactured and controlled one by one, without exception